Trex Signature® Railing Install Instructions

TREX ® SIGNATURE ® HORIZONTAL RAILING Installation Instructions

HOW TO INSTALL HORIZONTAL RAILING CROSSOVER POST TO CROSSOVER POST/ CONTINUED – TREX SIGNATURE STANDARD Attach Upper Railings Attachment of Bracket Covers, Skirts, and Caps

16

13

17

Trex Signature post

16. A ttach corresponding bracket covers over opening in bottom rails. 17. A ttach provided post skirt to bottom of posts when using Trex Signature post or composite two piece skirt to post sleeve (not shown).

13. W orking from one end of upper rail, snap balusters into upper rail working down length of rail. Fasten center baluster into center slot using two #8 x 1-1/4" (3.2 cm) screws (provided).

18

18. A ttach crossover post cap to crossover post.

14

14. A t crossover post

locations using a 7/64" (0.28 cm) drill bit, predrill for attachment of railing to crossover post

2

bracket. Attach fasten upper rail to crossover post by installing screws diagonally through upper rail into post using two self-tapping screws each side (provided) . 1 7/64" (.28 cm)

NOTE: Pre-drilling is required. Its best practice to pre-drill a single hole, then attach screw, and continue in this order.

15

15. A ttach “crowned” upper rail cover to upper rail by aligning cover on one side of rail. Then starting from one end of rail, snap cover onto opposing slot working down length of rail. GENTLE tapping with a rubber mallet may facilitate fastening.

14

Have Questions? 1–800–BUY–TREX

NOTE: Construction methods are always improving. Please ensure you have the most up-to-date installation instructions by visiting: trex.com

TR-HZSIGNATURE-0825

Made with FlippingBook Online newsletter maker