TREX SIGNATURE ® HORIZONTAL RAILING Installation Instructions
INSTALLATION OF HORIZONTAL SWIVEL RAILING/ CONTINUED
11. Installing Remaining Balusters into Bottom Rail See instructions on page 4 Post-to-Post or page 8 Post-to-Crossover Post. 12. Attach Upper Railings S ee instructions on page 4 Post-to-Post or page 8 Post-to-Crossover Post. 13. Attachment of Bracket Covers, Skirts, and Caps See instructions on page 4 Post-to-Post or page 8 Post-to-Crossover Post.
Cutting Top Rail Insert and Cover
6
Top rail
3/4" (1.9 cm)
3/4" (1.9 cm)
6. Slide rail insert out and cut 3/4" (1.9 cm) FROM EACH SIDE of insert, then slide back inside rail and center.
7. M ark and cut top rail cover same length as top rail for all top rail configurations. 8. Attaching Center Baluster to Bottom Rail See instructions on page
7
Top rail
Top rail cover
5—Post-to-Post or 8— Post-to- Crossover Post. 9. Attaching Foot Block (when required) See instructions on page 6. 10. Attaching Bottom Rail Cover and Bottom Rail to Brackets See instructions on page 4 Post-to-Post or page 8 Post-to-Crossover Post.
16
Have Questions? 1–800–BUY–TREX
NOTE: Construction methods are always improving. Please ensure you have the most up-to-date installation instructions by visiting: trex.com
TR-HZSIGNATURE-0426
Made with FlippingBook Online newsletter maker