TREX SIGNATURE ® HORIZONTAL RAILING Installation Instructions
HOW TO INSTALL SIGNATURE TRADITIONAL RAILING/ CONTINUED TREX SIGNATURE 13. S ecure 2 x 4 to top rail
INSTALLATION OF HORIZONTAL SWIVEL BRACKETS TREX SIGNATURE STANDARD Attach Swivel Brackets Base Using Trex Signature Posts TIP: Use a clamp to help hold brackets in place while fastening with screws.
13
using Trex Signature Cocktail Bracket (sold separately). Ensure that there is a bracket at each end of the railing section, then space brackets
1
1. M easure 1-3/8"
approximately every 24" and attach with 4 screws provided. NOTE: Predrilling before attachment is recommended.
(3.5 cm) from top of post base plate or 1-7/8" (4.8 cm) from decking surface. Mark with light line.
2-1/2" Post
1-3/8" (3.5 cm)
14. P re-drill a pilot hole and toenail 2-1/2" (6.4 cm) screw at each end of 2 x 4 into post on back side of rail (side not
14
2
2. C enter lower bracket on post above the marked line and attach using four self-tapping screws (provided) .
facing decking). If using a Trex Post Mount or Joist Mount Post with Trex post
sleeves, It is not a requirement to toenail the 2x4 into the post, however if this is done predrill a hole and use a 304SS screw (not provided), that will penetrate through the aluminum sleeve.
3
3. M easure up 32-5/16" (82.0 cm) for 36" (91.4 cm) tall railing or 38-5/16" (97.3 cm) for 42" (106.7 cm) tall railing from top of lower rail bracket. Mark with a light line.
15. Attachment of Bottom Rail Bracket Covers and Caps See instructions on page 8.
32-5/16" (82.0 cm) or 38-5/16" (97.3 cm)
4. C enter upper bracket on post below
4
marked line and attach using four self-tapping screws (provided) .
NOTE: Upper bracket is not required on
crossover post configuration.
18
Have Questions? 1–800–BUY–TREX
NOTE: Construction methods are always improving. Please ensure you have the most up-to-date installation instructions by visiting: trex.com
TR-HZSIGNATURE-0323
Made with FlippingBook Online newsletter maker