TREX ® SIGNATURE ® HORIZONTAL RAILING Installation Instructions INSTALLATION OF HORIZONTAL SWIVEL RAILING T REX SIGNATURE STANDARD / CONTINUED 11. Installing Remaining Balusters into Bottom Rail See instructions on page 4 Post-to-Post or page 8 Post-to-Crossover Post. 12. Attach Upper Railings S ee instructions on page 4 Post-to-Post or page 8 Post-to-Crossover Post. 13. Attachment of Bracket Covers, Skirts, and Caps See instructions on page 4 Post-to-Post or page 8 Post-to-Crossover Post.
20
Have Questions? 1–800–BUY–TREX
NOTE: Construction methods are always improving. Please ensure you have the most up-to-date installation instructions by visiting: trex.com
TR-HZSIGNATURE-0825
Made with FlippingBook Online newsletter maker