Trex Signature® Railing Install Instructions

HOW TO INSTALL RAILING BRACKETS

HOW TO INSTALL HORIZONTAL SWIVEL BRACKETS

1

1. M easure 1-7/8" (4.8 cm) up from deck surface. Mark with light line.

4a. If installing Signature post, center lower bracket on post above the marked line and attach using four self-tapping screws (provided).

4

1-7/8" (4.8 cm)

4b. If installing 4 x 4 post sleeve or Aluminum post sleeve, center lower bracket on post above the marked line and attach using four 2" (5.1 cm) wood screws (provided). 4c. If installing 6 x 6 post sleeve, center lower bracket on post above the marked line and attach using four 2-1/2" (6.4 cm) wood screws (not provided). NOTES: •  IMPORTANT - If installing a post sleeve with a one- piece skirt, ensure the skirt is installed BEFORE installing lower bracket.

2

2a. If installing Signature post, center lower bracket on post above the marked line and attach using four self-tapping screws (provided).

2b. If installing 4 x 4 post

sleeve or Aluminum post sleeve, center lower

bracket on post above the marked line and attach using four 2" (5.1 cm) wood screws (provided).

2c. If installing 6 x 6 post sleeve, center lower bracket on post above the marked line and attach using four 2-1/2" (6.4 cm) wood screws (not provided).

3

3.  Measure up from

decking surface 34- 3/16" (86.8 cm) for 36" (92 cm) tall railing, or 40-3/16" (102.1 cm) for 42" (107 cm) tall railing. Mark with a light line.

34-3/16" (86.8 cm) or 40-3/16" (102.1 cm)

3

Have Questions? 1–800–BUY–TREX

NOTE: Construction methods are always improving. Please ensure you have the most up-to-date installation instructions by visiting: trex.com