Trex Signature® Railing Install Instructions

TREX SIGNATURE ® STAIR RAILING Installation Instructions

ATTACHING RAILS IN CROSSOVER POST APPLICATIONS CONTINUED TREX SIGNATURE Cutting Top Stair Rail and Rail Insert For Stair Crossover Post-to-Stair Crossover Post Configuration Installing Balusters into Bottom Stair Rail 13. Place balusters into

13

holes in lower stair rail by snapping fully into place. In some cases, GENTLE tapping with a rubber mallet may facilitate fastening.

KEY Mark Cut

KEY

10

Top stair rail

Attaching Upper Stair Rails 14. W orking from one end of upper stair rail, snap balusters into upper stair rail working down length of rail.

14

10. .C ut each end of the top stair rail along with rail insert on the mark line to allow for fit into the crossover post bracket on each side. Cutting Top Stair Rail Cover, and Attachment of Top Stair Rail Cover

11

11. Mark and cut top rail cover same length as top rail for all top rail configurations.

15a. For stair post-to-post configuration, attach

15a

top stair rail to top stair bracket (all types) using two self-tapping screws (provided) on each side of stair bracket.

12

15b. F or stair crossover post configuration, fasten upper stair rail to swivel crossover post bracket by installing screws diagonally through crossover stair bracket into upper rail using two self-tapping screws (provided) on each side.

15b

12. A ttach “crowned” upper stair rail cover to upper stair rail by aligning cover on one side of rail. Then, starting from one end of stair rail, snap cover onto opposing slot working down length of stair rail. GENTLY tapping with a rubber mallet may facilitate fastening.

12

Have Questions? 1–800–BUY–TREX

NOTE: Construction methods are always improving. Please ensure you have the most up-to-date installation instructions by visiting: trex.com

TR-SIGN-ST-0422

Made with FlippingBook Online newsletter maker