Trex Signature® Railing Install Instructions

HOW TO INSTALL HORIZONTAL RAILING POST TO POST/ CONTINUED TREX SIGNATURE

Cutting Top Rail

Attaching Center Baluster to Bottom Rail

KEY Mark Cut

KEY

Center balluster slot

5

8

Top rail

Inverted Bottom view

1/4" (0.6 cm)

1/4" (0.6 cm)

5. Cut each end of top rail 1/4" (0.6 cm) shorter than mark to allow for fit into top rail brackets. Cutting Top Rail Insert and Cover

8. A ttach shorter, center baluster in center slot in bottom rail using two #8 x 1-1/4" (3.2 cm) screws (provided). Attaching Bottom Rail Cover

6

9

Top rail

3/4" (1.9 cm)

3/4" (1.9 cm)

9. A lign flat cover on one side of bottom rail in slot on side of rail. Then starting from one end of rail snap cover onto opposing slot working down the length of rail. In some cases, GENTLE tapping with a rubber mallet may facilitate fastening.

6. S lide rail insert out and cut 3/4" (1.9 cm) FROM EACH SIDE of insert, then slide back inside rail and center.

7

7. M ark and cut top rail cover same length as top rail for all top rail configurations.

Top rail

Top rail cover

5

Have Questions? 1–800–BUY–TREX

NOTE: Construction methods are always improving. Please ensure you have the most up-to-date installation instructions by visiting: trex.com

TR-HZSIGNATURE-0825

Made with FlippingBook Online newsletter maker