Trex Signature® Railing Install Instructions

HOW TO INSTALL HORIZONTAL RAILING POST TO POST/ CONTINUED TREX SIGNATURE 16 20 21

16. A ttach top rail to top bracket using two #10 x 1" self-tapping screws (provided) on each side of bracket.

Post sleeve

® Trex Signature ™ post

20. A ttach post caps to Trex Signature posts. (Use of rubber .mallet may be required for secure attachment.) 21. A ttach post caps to post sleeves using external grade PVC construction adhesive (apply adhesive on the inside self-centering/corner tabs).

17

17. A ttach “crowned” upper rail cover to upper rail by aligning cover on one side of rail. Then starting from one end of rail, snap cover onto opposing slot working down length of rail. GENTLE tapping with a rubber mallet may facilitate fastening. Attachment of Bracket Covers, Skirts, and Caps

18

19

Trex Signature ™ post ®

18. Attach corresponding bracket covers over opening in upper and bottom rails. 19. A ttach provided post skirt to bottom of posts when using Trex Signature post or composite two piece skirt to post sleeve (not shown).

7

Have Questions? 1–800–BUY–TREX

NOTE: Construction methods are always improving. Please ensure you have the most up-to-date installation instructions by visiting: trex.com

TR-HZSIGNATURE-0825

Made with FlippingBook Online newsletter maker