Trex Signature® Railing Install Instructions

TREX SIGNATURE ® HORIZONTAL RAILING Installation Instructions

HOW TO INSTALL HORIZONTAL RAILING POST TO POST/ CONTINUED TREX SIGNATURE

16

21

20

16. Using a 7/64" (0.28 cm)

drill bit, pre-drill at marked location for attachment of railing to bracket. Attach upper rail to each bracket by installing screws diagonally through upper rail into bracket using two self-tapping screws each side (provided) .

Post sleeve

® Trex Signature ™ post

2

7/64" (.28 cm)

1

20. .Attach post caps to Trex Signature posts. (Use of rubber m. allet may be required for secure attachment.) 21. A ttach post caps to post sleeves using external grade PVC construction adhesive (apply adhesive on the inside self-centering/corner tabs).

NOTE: Pre-drilling is required.

17

17. A ttach “crowned” upper rail cover to upper rail by aligning cover on one side of rail. Then starting from one end of rail, snap cover onto opposing slot working down length of rail. GENTLE tapping with a rubber mallet may facilitate fastening.

Attachment of Bracket Covers, Skirts, and Caps

18

19

Trex Signature ™ post ®

18. A ttach corresponding bracket covers over opening in upper and bottom rails. 19. A ttach provided post skirt to bottom of posts when using Trex Signature posts.

8

Have Questions? 1–800–BUY–TREX

NOTE: Construction methods are always improving. Please ensure you have the most up-to-date installation instructions by visiting: trex.com

TR-HZSIGNATURE-0323

Made with FlippingBook Online newsletter maker