Trex Signature® Glass Railing Installation Instructions

TREX SIGNATURE ® HORIZONTAL GLASS RAILING Installation Instructions

HOW TO INSTALL STANDARD HORIZONTAL GLASS RAILING/ CONTINUED TREX SIGNATURE ®

Installing Top Head Gasket and Top Rail

Attaching Top Rail to Brackets

16

18

16. Install top head gasket onto the top of the glass panel. Note that the gasket may be loose at this stage.

18. Drill two 1/2" holes approximately 1/2" from end of top rail. Repeat this on opposite side of top rail.

IMPORTANT NOTES: » H OLES CANNOT EXTEND PAST

1/2" (1.3 cm)

17

BRACKET, OTHERWISE BRACKET COVER WILL NOT COVER HOLES.

Bracket Edge

Post

» O NLY DRILL 1/2" HOLES THRU TOP

WALL OF TOP RAIL. DO NOT USE A STEP BIT.

19

17. S tarting at one end and working down, press the top rail firmly onto the top of the glass panel (with top head gasket on glass). Ensure the top rail is centered properly and top rail will seat into brackets when finished.

19. U sing 9/64" bit provided, center

into above holes and PREDRILL into top rail bracket at a depth of approximately 1-1/4". Use care to not drill through underside of top bracket.

1-1/4" (3.2 cm)

6

Have Questions? 1–800–BUY–TREX

NOTE: Construction methods are always improving. Please ensure you have the most up-to-date installation instructions by visiting: trex.com

THGR-0323

Made with FlippingBook - PDF hosting