4.0 Installation This section will provide you with installation guidelines for your MMD Series material testing system. Starrett recommends that your authorized Starrett Representative be responsible for installing and commissioning your system at your location. NOTE Starrett recommends that your authorized Starrett Representative installs and commissions your MMD Series material testing system.

4.2 Starrett Responsibilities The L.S. Starrett Company is responsible for the following:

Insurance Your system is shipped FOB Factory, meaning ownership and liability for the system transfers from Starrett to the customer at the Star- rett shipping dock. Unless other shipping terms are specified in the customer’s purchase order, and accepted by the L.S. Starrett Company, FOB Factory shipping terms apply. Under these terms, the L.S. Starrett Company is responsible for insurance coverage while the system is in the Starrett factory until it reaches the Starrett shipping dock. The customer assumes insurance responsibility as soon as the system is at the Starrett shipping dock. Installation Starrett, or the authorized L.S. Starrett dealer, is responsible for the complete installation of the test frame and all associated components and accessories that were purchased from the L.S. Starrett Company. The customer is NOT to make any attempt to install any system com- ponents or accessories without the authorization and supervision of the Starrett representative responsible for the installation. Initial Operation The Starrett representative responsible for the system installation will perform an initial operational check and verification once installation is completed. This initial operation will include a verification of the cali- bration and will include a functional acceptance check to be witnessed by the customer. On-site Training The Starrett representative may be required to train customer per- sonnel on the proper operation of the system and all components purchased from the L.S. Starrett Company. Training will typically require one day (1 day) and is structured to accommodate up to three (3) individuals. Customized training, and extended training for larger groups of users can be scheduled through your Starrett representative. A service fee is charged for training outside the one day orientation. Documentation The L.S. Starrett Company provides all the documentation required to operate the system, including manuals for the test frame, components and associated software products (L2 or L3 Series software).

4.1 Customer Responsibilities The customer is responsible for the following :

Site Preparation The customer is responsible for the site preparation prior to the system being moved to its final site location. The customer must ensure that the site requirements are satisfied prior to scheduling the installation. Handling and Transporting Unless specifically arranged otherwise, it is the customer’s responsi- bility to arrange the off loading, unpacking and moving of the testing system to the final site location. Insurance and Safety The shipping terms for your Starrett system and all components purchased from the L.S. Starrett Company are FOB Factory (Ex Works), meaning ownership and liability for the testing system transfers to the customer at Starrett’s loading dock. Under these terms, the customer is responsible for securing the applicable transit insurance on the ship- ment and arranging safe transport to the final destination. When transporting a test frame within the customer’s own premises, the customer is responsible for its safe transport. Your Starrett repre- sentative can supervise the transportation to the test frame’s final site location. Material Disposal The customer is responsible for the proper disposal of any waste mate- rials generated from the system installation.

Additional copies of manuals are available and can be ordered through your Starrett representative.