Table of Contents
Page
Page
General Safety Precautions
4 4
5.0 SYSTEM OPERATION 5.1 Operating Principles 5.2 Operator Controls 5.2.1 Emergency Stop Switch 5.2.2 Mains Power Switch 5.2.3 Crosshead Jog Switch 5.2.4 Test Start/Stop Switch 5.2.5 Over Travel Limit Switches
38 38 38 38 39 39 40 41 42 42 42 43 44 45 46 47 47 47 48 49 49 49 49 50 50 50 51 51 51 51 51 51 51 51 52 52
Warnings
INTRODUCTION
6 6 7 8 8 8 9 9 9
1.0 1.1 1.2 1.3 1.4 1.5
System Description
System Safety and Labeling
Product Support
Calibration and Verification
Software Options
Using L3 Material Test Software
6.0 USING YOUR MMD SERIES TEST FRAME
1.5.1 1.5.2 1.5.3
Using L2 Plus Advanced Force Analysis Software
6.1 System Settings Options
Using L2 Force Measurement Software
6.1.1 Setting Crosshead Travel Limits
6.1.2 Setting Crosshead Maximum Travel Velocity
SYSTEM DESCRIPTION
10 10 11 14 14 14 14 15 15 15 15 16 19 19 20 22 23 24 24 24 25 26 27 28 29 29 30 31 31 34 34 35 35 36 37
2.0 2.1 2.2 2.3
6.1.3 Setting Grip Protection 6.1.4 Setting Load Cell Limit
MMD Series Product Specifications FMD Series Product Specifications
6.1.5 Using Deflection Compensation Correction 6.2 Using L3 Series Material Test Software
Common Specifications Power Requirements
6.2.1 Starting an L3 Test 6.2.2 Pausing an L3 Test 6.2.3 Stopping an L3 Test
2.3.1 2.3.2 2.3.3 2.3.4 2.3.5 2.3.6 2.3.7
Fuse Ratings
Noise Level Rating
Environmental Specifications
7.0 USING YOUR FMD SERIES TEST FRAME 7.1 Using L2 Plus Series Force Analysis Software
Cyclic Testing
Load Hold Testing Test Frame Weights
7.1.1 Starting an L2 Plus Test 7.1.2 Stopping an L2 Plus Test
MMD/FMD Dimension Drawings
2.4
7.2 Using L2 Series Force Measurement Software
LIFTING AND HANDLING General Precautions Unpacking Your System
7.2.1 Starting an L2 Test 7.2.2 Stopping an L2 Test
3.0 3.1 3.2 3.3 3.3 4.0 4.1 4.2 4.3 4.4
8.0 SYSTEM MAINTENANCE 8.1 Preventive Maintenance 8.1.1 Daily Maintenance Checks 8.1.2 Authorized Field Maintenance
Moving Your System
Positioning Your System for Use
INSTALLATION
Customer Responsibilities Starrett Responsibilities
8.1.3 Cleaning 8.1.4 Lubrication
Site Considerations Setting Input Voltage
8.2 Maintenance Procedures 8.2.1 Travel Limits 8.2.2 Emergency Stop 8.2.3 Fuse Replacement
Verifying Your Input Power Source
4.4.1 4.4.2
Setting Input Voltages
Connecting System Components Installing L3/L2 Plus Workstations
4.5
9.0 CALIBRATION AND VERIFICATION
52
4.5.1 4.5.2 4.5.3 4.5.4 4.5.5 4.5.6 4.5.7 4.5.8 4.5.9
Installing the L2 Tablet
Installing Base Clevis Assembly Installing Load Cell Sensor
Installing Load Cell Sensor Clevis Assembly
Installing Test Fixture
Installing Extensometers (MMD Series only)
Installing a Printer
Installing Bench Mounting Clips Using the Optional Splinter Shield
4.5.10
starrett.com
3
Made with FlippingBook - professional solution for displaying marketing and sales documents online