4.5.3 Installing Base Clevis Assembly The base clevis assembly threads onto the MMD Series base plate. The clevis should screw all the way into the base plate for a secure fit. Once the clevis is threaded onto the base plate, then screw the two locking rings onto the clevis. The locking rings are used to secure your bottom test fixture and allow you to align your test fixture to your preference.
4.5.4 Installing Load Cell Sensor All Starrett load cell sensors are “plug & play” and are TEDS compliant to IEEE 1451.4. All load cells have a 9-inch (230mm) length cable with a bayonet-style threaded connector. Connect the load cell sensor to the mating connector located on the MMD Series test frame (located beneath the crosshead on the right- hand side). The load cell sensors must be aligned on the crosshead so that the load cell sensor’s cable has sufficient slack.
Load Cell Connector
Clevis Assembly
starrett.com
31
Made with FlippingBook - professional solution for displaying marketing and sales documents online