Ardmac Agile Cleanroom Suites Brochure

Modular Cleanroom Systems ELECTRONICS

odular Cleanroom Systems

Ardmac was appointed by Clas-Sic as the specialist cleanroom contractor to supply, install and commission ISO 5 & 6 suites. The scope of works included partitions complete with doors and glazing, ceiling grid and plenum, Fan Filter units with U15 filters, and yellow lighting for photo sensitive areas.

Ardmac have been working for this client for the past 25 years continuously and were approached to participate in an IPD (Integrated Project Delivery) for the tool install of FAB 24. The entire process encouraged the creation of partnership rather than conflict to deliver a successful project in the most LEAN manner as possible.- “One Team, one goal”

Analog appointed Ardmac as their specialist cleanroom contractor to construct ISO 6 ballroom clean- room within the existing facility. The scope of works included RCU’s and ducting, Plenum top, Aluminium partitions, doors and glazing, pressurised plenum with gel ceiling grid, ULPA filters. ESD raised aluminium floor, epoxy sub floor, yellow teardrop lights, air shower and materials transfer hatches.

Ardmac was appointed by Seagate to extend their manu- facturing facility and to design, supply and install their ISO 5 cleanroom based on their URS. The scope of works included RCU’s, chilled water and ducting, Plenum top, Aluminium parti- tions, doors and glazing, ceiling grid and Fan Filter Units, ESD raised aluminium floor, epoxy sub floor, yellow teardrop lights, door automation and complete fitout of change areas.

Ardmac was appointed to deliver the Base built Construction and Tool Install across 3no Fab’s with a cleanroom classification of ISO 5 (Class 1) The scope of works included aluminium stick built partitions complete with doors and glazing, ceiling with U16 filters, yellow lighting for photo sensitive areas and aluminium raised metal floors.