Modular Cleanroom Suites Presentation

PHARMACEUTICAL & BIOLOGICS

GSK Wavre Vaccines

Eli Lilly Biologics

Janssen Biologics 1

Alexion Biologics

Pfizer NSI Biologics

Ardmac were contracted by GSK to deliver the architectural fitout of their new ISO 6, 7 & 8 cleanrooms and coldrooms. As part of Ardmac’s innovation they introduced for the first time modular agile cleanroom partitions & ceilings to the GSK Wavre site. The cleanroom scope included Bi- Panel walls and modular ceilings allowing easy access for service coordination which facilitated finishes to be completed within one room whilst service installation continued within the adjoining rooms.

Ardmac were appointed through an IPD (Integrated Project Delivery) programme to design and construct ISO 7 & 8 cleanrooms for Lilly on the IE43 project, as well as associated controlled non-classified accommodation and support areas. Works included a full architectural package comprising epoxy floors, modular walls and 2.5Kn/M 2 interchangeable ceilings, automated and manual doors, lighting, air distribution terminal housings and low level return air systems.

Ardmac were appointed as the specialist cleanroom contractor and through early engagement they designed & Fitted out new cell culture and purification suite. The use of their heavy duty modular cleanroom ceiling created a construction platform facilitating dual activities to take place above and within the cleanroom at the same time, accelerated the overall construction phase allowing Janssen to get to the market ahead of schedule.

Alexion engaged Ardmac as the specialist cleanroom contractor and the use of modular interchangeable architectural products we through early engagement we designed and constructed Grade C & D cleanroom spaces. The scope of works included the install of a 2.5Kn/m 2 walk-on ceiling, modular partitions, doors, lights, terminal filter housings, floors, fixtures & fittings and the Design & Build of 6 ISO 8 cold rooms.

As an innovative cleanroom contractor Ardmac were tasked to design and construct three bio-manufacturing suites to ISO 6, 7 and 8 standards. The use of their heavy duty modular cleanroom ceiling which doubled as a construction platform allowing 1 st and 2 nd fix activities to take place above and below the ceiling simultaneously delivering one of the fastest to market facilities for Pfizer.

8,000m²

13,000m²

5,000m²

6,500m²

3,000m²