PROJECT HIGHLIGHTS
T'is 'Snow' Joke! A new compost processing facility at a landfill in Saskatoon, Saskatchewan, needed its entire footprint lined for environmental reasons, mainly to prevent contaminants from seeping into the soil. Geosynthetic Clay Liner (GCL) was selected for this project. In total, Titan supplied and installed 287,900 SF (26,746 m2) of GCL, completing the project in snowy, cold winter conditions.
Swamp Grid™ Pre-Design Saves the Day
After site-specific consultation with the client, we completed a base reinforcement pre- design for a new lumber manufacturing facility site in Vauxhall, Alberta. This pre- design included the Swamp Grid™ 20 geogrid solution. In addition to providing a pre-design for this project, Titan supplied 122 rolls of Swamp Grid™ material, totaling over 390,000 SF (36,232 m2). That's the equivalent of almost 7 NFL football fields!
5-Star Pre-design
Lining Caribbean Agriculture Irrigation Ponds Not 1, not 2, but 3 irrigation pond liners were installed this year by Titan crews and local workers at a site in the Bahamas. The ponds store water from the wet season for agricultural crop irrigation during the dry season. In total, our crews installed over 450,000 SF (41,806 m2) of HDPE geomembrane liner for this project.
Made with FlippingBook - Online magazine maker