The flare is typically the last to go offline and the first to go online. At the start of the shutdown, the temporary works are installed together with the temporary lifting frame and the frame is tested in‑situ to its S.W.L. If temporary access is required, either due to no in‑situ access platform or the poor condition of the access platform, it can be designed and installed.