Livengood Gold Project in Alaska’s Golden Heart

Updated Pre-Feasibility Study (PFS) in November 2021

Budget of $3.7 million. Continue the focus on metallurgical studies to better dene and rene the project owsheet. 2,000 kg of metallurgical composites being processed: Evaluate the optimum grind size Determine whether dierent recovery parameters should be applied across orebody • • • Whittle Enterprise Optimization to identify optimal project configuration • BBA, Inc. to continue as lead consultant • Updated PFS to be complete in October 2021 • Work plan will further de-risk project Updated Pre-Feasibility Study (PFS) in November 2021 • Mineral resource: 13.6m oz gold at 0.60 g/t. • Gold production: 6.4m oz for 20-year Life of Mine (LOM), annual 317,000 oz. • CAPEX $1.93B, Sustaining Capital $658m. • All-in Sustaining Costs (AISC) years 1-5 $1,038/oz, LOM $1,171/oz. • Direct employment: 800 construction jobs, 331 production jobs. BBA Inc. retained to continue guiding metallurgical program. 2017 PFS showed Improved Project (as compared to 2013 Study) • Project size optimized at 52,600 tons/day • 6.8 million ounces of gold produced over 23 years • All-in Costs (AIC) down more than $250/oz to $1,247/oz We will continue to prepare for futu re potential permitting and construction, while also conducting baseline environmental studies. Livengood Gold Project: highly levered to the gold price with the opportunity to be a successful Alaska gold mine for decades for decades to come. • Production Costs before Capital $878/oz • All-in Sustaining Costs (AISC) $976/oz Project Metrics based on 2017 PFS • 6.8 million ounces of gold produced over 23 years • Production Costs before Capital $878/oz • All-In-Sustaining Costs (AISC) $976/oz • All-In-Costs (AIC) $1,247/oz *April 10, 2017 NI 43-101, Pre-Feasibility Study Livengood Gold Project: highly levered to the gold price with the opportunity to be a successful Alaska gold mine for decades to come. We will continue to prepare for future potential permitting and construction, while also conducting baseline environmental studies.

ITHMINES.COM

Made with FlippingBook. PDF to flipbook with ease