MERIDIAN CROSSBAR ASSEMBLY INSTRUCTION

RAILING INSTALLATION

DALLAS LOS ANGELES BALTIMORE

BOLT TO SUBSTRATE 1 Use four fixing bolts to attach the stand-off post into the substrate of your choice. Take care to use

CONCRETE FLOOR WEDGE BOLT

WOOD FLOOR HEX SCREW

54-33 _ 2-1/2" ~ 3/8"

54-23 _ 2-1/2" ~ 3/8"

the correct bolt for the substrate you are using. Use a concrete floor wedge bolt for concrete (54-33) or a wood floor hex screw for wood. (54-23)

SET POSTS APART 2

LOOSEN GRUB SCREWS 3

Set the posts four to five feet apart from the center with the grub screws facing side you would like to set your railing.

Using an allen (hex) key, loosen the grub screws until they are loose and easily rotated.

SET RAILS 4

TIGHTEN GRUB SCREWS 5

Slide the rails through the holes on the sides of each grub screw. Make sure each rail is cut to the same size before this step.

Tighten the grub screws to lock the railing in place.

ADD CROSSBAR END CAP 6

Using either an adhesive or welding, affix the crossbar end caps (55-10168) to each rail. Two endcaps will be needed for each rail you want to install. Repeat until all rails are capped between both stand-off posts.

CROSSBAR END CAP **2 REQUIRED PER BAR

55-10168

CROSSBAR ROD COMPONENTS

SOLID CROSSBAR SATIN STAINLESS STEEL

CROSSBAR END CAP NEED 2 FOR EACH ROD

CROSSBAR HOLDER ROUND POSTS

CROSSBAR HOLDER SQUARE POSTS

55-10161

only accepts 55-10161 crossbar

55-10168

_ 20' ~ .47" \ 12.00 lbs

55-10165

55-10166

CHOOSE YOUR POST STYLE

STOCKED IN DALLAS ONLY

PRE-INSTALLED STAND-OFF Posts FOR CROSSBAR ROD INSTALLATIONS

WIDTH / DIAMETER

ASSEMBLY HEIGHT

POST SHAPE

WEIGHT GAUGE

MOUNT HOLES

ITEM #

55-S36FL9CB

36” Floor

9

2” 12.60 lbs 2 mm

55-S42FL11CB

42” Floor 11 2” 15.50 lbs 2 mm

55-R36FL9CB

36” Floor

9

2” 10.50 lbs 2 mm

55-R42FL11CB

42” Floor 11 2” 13.00 lbs 2 mm

55-S36FA9CB

36” Fascia 9

2” 15.40 lbs 2 mm

55-S42FA11CB

42” Fascia 11 2” 18.00 lbs 2 mm

55-R36FA9CB

36” Fascia 9

2” 12.90 lbs 2 mm

55-R42FA11CB

42” Fascia 11 2” 15.00 lbs 2 mm

GET YOUR HARDWARE & TOOLS

FOR CROSSBAR ROD INSTALLATIONS

CROSSBAR STANDOFF DRILL & TAP SET

CONCRETE FLOOR WEDGE BOLT

54-32

54-33

#25 bit #10-24 tap

_ 2-1/2 " ~ 3/8"

CROSSBAR #10 WOOD SCREW

WOOD FLOOR HEX SCREW

CROSSBAR 10-24 METAL SCREW

54-23

54-31

54-30

_ 2-1/2" ~ 3/8"

_ 1" ~ .33"

_ 2" ~ .33"

GRAB YOUR 1-5/8” OD HANDRAIL

FOR CROSSBAR ROD INSTALLATIONS

ROUND HANDRAIL SATIN FINISH

HANDRAIL POST SADDLE DRILL & TAP SET

HANDRAIL POST SADDLE SCREW REQUIRES 2 PER POST

55-10423

54-24

55-1104

#7 bit 1/4"-20 tap

_ 20' ~ 1-5/8” (42.4mm) > .080" \ 28.70 lbs

_ 1/2" ~ 1/2"

Page 1 Page 2

Made with FlippingBook interactive PDF creator