CIP Projects
Project Description: Replace water and sewer lines Project Status: Design is 90% completed. Bid documents have been prepared.
Project Name: 2023 Renovation and Replacement Phase 2 Project Location/Limits: Woodhaven Dr., Ray Andra Dr., Vince Ln., Red Bud Dr., Oak Trail,
Woodhaven Dr. and Lakewood Dr. Project Type: Pavement replacement Project Description: Reconstruction of streets Project Status: Design is 70% completed.
Project Name: 2023 Alley Reconstruction Project Location/Limits: Oak Meadows Ln., Woodbrook Dr., Glen Ave., Pine Tree/Shadywood, Hillside/Crestwood Cloudcrest/Blue Sky and Stardust/Blue Sky, Westlake Alley. Project Type: Alley Project Description: Remove and reconstruct alley pavement Project Status: Design is 100% completed. Currently working on Bid documents.
Project Name: Shoreline Dr. Drainage Project Location/Limits: Shoreline Dr. and Beltwoods Dr. Project Type: Drainage Project Description: Drainage Infrastructure replacement and shoring of failing support, Install Gabions and anchors. Project Status: Design 100% completed. Currently working on Bid documents.
Project Name: Methodist Care Center Erosion Control Project Project Location/Limits: 109 Methodist Way Project Type: Drainage Project Description: Streambank erosion protection. Project Status: City has published the Bid. The Bid will be opened on January 8,2024.