CITY OF DESOTO Capital Improvement Program FY 2022- 2026 Water Project Details - FUND 508

Project Name/No.: Project Description: Project Name/No.: Project Description: Project Name/No.: Project Description: Project Name/No.: Project Description: Project Name/No.: Project Description: Project Name/No.: Project Description: Project Name/No.: Project Description:

Perform an Inflow and Infiltration (I & I) Study on Sanitary Sewer Drainage Basin C. The study basin is located in an area beginning east of Hampton Road from Danieldale Road and south to Ten Mile Creek. This project also will repair and replace old, deteriorated and/or undersized sanitary sewer lines specifically in Basin C. Basin D Renovations- BASD Perform an Inflow and Infiltration (I & I) Study on Sanitary Sewer Drainage Basin D. The study basin is located in the Polk Street corridor from Danieldale Road to Ten Mile Creek. This project also will repair and replace old, deteriorated and/or undersized sanitary sewer lines specifically in Basin D. Bee Branch / Basin O Renovations-BBBOR Perform an Inflow and Infiltration (I & I) Study on Sanitary Sewer Drainage Basin O. Construct improvements as identified in the study. The study basin is located in the Uhl Road corridor from Parkerville Road to our south City limits. Perform an Inflow and Infiltration (I & I) Study on Sanitary Sewer Drainage Basin A. The study is located in the most northwestern area of the City. Originating just west of the city limit boundary to the est of Old Hickory Road extending south, and ending just east of the Westmoreland Road and Wintergreen intersection. Basin C Renovations Water distribution system will be evaluated to determine the best location(s) to add chlorine to the water purchased from Dallas Water Utilities. Once locations are identified, specifications for the chlorine equipment will be developed and a supply vendor identified to provide equipment on a pilot basis for evaluation. An equipment lease The hydraulics for the 2006 Water Distribution System Master Plan will be updated to assist the City in optimizing pumping operations, to better determine when and where system upgrades and improvements need to occur, and to create a platform for the Public Utilities Department to develop a GIS system. Chlorine Booster Installation of 12-inch waterline along Wintergreen Road that will replace existing 8-inch waterlines. Water Tank Fencing Construction of property fencing aorund Hampton, Parks & Parkerville storage tanks Water Master Plan Coating and rehabilitation of the exterior and interior of the Parkerville EST. Also includes interior safety updates and mixing and monitoring improvements to the Parkerville EST and improvements to the site's security, fencing, access gate, and lighting. SCADA and Electrical upgrades for PS and EST Overhauling the SCADA system and its electrical equipment at all pump stations and EST's. Will include replacing 12" Line-Wintergreen (Cockrell - Westmoreland) Reconstruction of water, sewer and paving from Pleasant Run to Belt Line Rd Westmoreland Pump Station #5-WPSIM Evaluate efficiency of the Westmoreland Pump Station and Hampton Pump Station for additional pumps and electrical/building renovations. Parks Elevated Storage Tank Rehab The coating rehabilitation of the exterior and interior of the Parks EST. Also includes improvements to the site's security, fencing, access gate, lighting, drainage, and sidewalks. Briarwood Elevated Storage Tank Rehab and Site Imp versus purchase option will also be evaluated. Annual Water Renovation/Replacement Program Repair or replace old, deteriorated and/or undersized water lines throughout the community. Basin A Renovations Mixing and monitoring imrprovements as well as improvements to to Briarwood EST site's access gate. Parkerville Elevated Storage Tank Rehab and Site Imp Water Master Plan Improvements (798 zone) Add Pump #6 to 798 Zone (7.2MGD) at Westmoreland Pump Station Hampton Pump Station Rehab Evaluate efficiency of Hampton Pump Station and design/ construct/install additional pumps and electrical/building renovations. Bolton Boone Pump Station Rehab Design and construct Bolton Boone pump station and elevated storage tank. 20" Transmission Line Bolton Boone PS Installation of 20-inch transmission main that runs west from the existing Hampton Road Pump Station site along Centre Park Boulevard and Cedar Rapids Lane to Westmoreland Road. Hampton Road Improvements Annual Water Renovation/Replacement Program Repair or replace old, deteriorated water lines throughout the community. Some water lines in the city are also undersized. Most of these funds are spent on replacing old water lines.

Project Name/No.: Project Description:

Project Name/No.: Project Description: Project Name/No.: Project Description: Project Name/No.: Project Description: Project Name/No.: Project Description: Project Name/No.: Project Description: Project Name/No.: Project Description:

Project Name/No.: Project Description:

Project Name/No.: Project Description: Project Name/No.: Project Description: