Oven Assembly by RTT

Section A

Floor Assembly

Step 1.

Floor Assembly W ith ¼” Floor Plate (optional).

(A)

Lay two sections of the floor plate down.

(B)

Square corner to corner and weld together.

Weld 2” long

approximately 10” apart. Continue until ba se is completely together per

dimensions on your set of drawings (see Dwg 1-B).

Note : Standard ovens DO NOT have ¼” floor. Step (A) is not required.

Step 2.

Floor Channel (All Dimensions Are On Customer Set of Drawings)

(A) Take chalk line and layout lines for O.D. (outside dimensions) & I.D.

(inside dimensions) of oven side walls and one end wall if oven is single

entry. If oven is double entry you only need side walls.

(B) Cut if necessary T-4 channel, lay between lines and attach channel the

full length of the oven. If it is a single entry you must 45 one end of each side

wall floor channel and both sides of end wall floor channel (see Dwg. 3-B).

(C) If oven has ¼” floor, you can weld floor channel to floor plate. If it has

no floor, you must drill holes in bottom of channel for anchor bolts. Anchor

with 3/8” floor anchors (not supplied) approximately 12” from each end and

then ever 6 ft. If heater box is floor mounted, you must cut T-4 or T-6 so you

leave an opening for it. You get opening width and location from customer

drawing (see Dwg. 3-C).