Oven Assembly by RTT

Section B

Wall Assembly

Step 4.

Installation of Walls.

(A) Fill male side of oven panel with 1 ½” x 4” strip insulation and pu t

approximately ¼” to ⅜” bead of oven cement on female side of panel (Dwg.

4-A).

(B) Start installation with first panel (see panel layout for panel number) at

door opening (see dwg. on placement of 1 st panel).

(C) After placing first panel, use 4 ft. level to get panel plumb. Put two Tek

Screws in bottom end of panel. This should hold panel in place. Put all Tek

Screws in bottom of panels as you go.

(D) Most panels are standard 26” repeat. You should mark floor channel

for both walls because when you install your panels you may get some tighter

together than others. With base channel marked 26”, you will keep both walls

together and the same length. All panels must have strip insulation and oven

cement bead. Cement bead always goes to inside of oven.