Section C
Door Header and Side Wall Face Channel
Step 6.
Installation of Side Wall Face Channel and Door Header.
(A) You will have two (for single entry oven) and four (for double entry
oven) C4 x 5.4 channels wit h ¼” holes 12” apart (see customer prints for item
number).
(B) Install these by forcing them over the male end of the side wall panel.
Make sure top and bottom of channels are flat against panel (see drawing).
Put 4 ft. level on face of channel to insure face of the oven is plumb. If both
sides are not plumb, the doors will not seal properly. Install all Tek Screws
(Dwg 6-B).
(C) Get proper measurement from customer drawings and mark location
face channel for door header. Place door header on mark.
The ¼” end
plates on the door header should be flush with outside of the face channel.
Tack door header in place (see Dwg 6-C) ( do not weld solid until door
opening is squared, after step 6-F).
Made with FlippingBook - professional solution for displaying marketing and sales documents online