Oven Assembly by RTT

(D) Use tape measure and check to make sure the top and bottom

measurements are the same (outside of face channel).

(E) Measure from corner to corner to insure opening is square (see Dwg.

6-E).

(F) After all openings are square, tack a brace to hold in place (Dwg. 6-F).

Use a piece of T-7 angle for this. Weld door header solid at top in both ends,

and to floor channel on both sides at bottom. If the ¼” floor is used, weld

across front of face channel at bottom. With double entry oven this step must

be done on both ends.

Made with FlippingBook - professional solution for displaying marketing and sales documents online