Oven Assembly by RTT

Section D

Roof Assembly

Step 8.

Installation of Roof Panels.

(A) Put a bead of oven cement on all T-7 angles before you start to install

panels.

(B) Put insulation and oven cement on 1 st panel that attaches to header

panel (see customer drawing for the panel layout). Every panel must have

strip of insulation and bead of oven cement before they are installed (see

Dwg. 8-B).

(C) Repeat installation of roof panels per panel number call out on

customer drawings.

(D) Install two panels and measure on each side to maintain the same

measurements side to side. It is possible to get one side pushed in more

than the other, and they will not come out correct at the end. Install Tek

Screws in each panel after making sure both sides are even. Put Tek Screws

in each panel as they are installed.