Oven Assembly by RTT

Section F

Flashing – Openings

Step 10.

Installation of Opening Flashing (These openings will be for

heater box installation. See customer drawing for locations and

opening size).

(A) Install insulation in ends and edges of panel opening (see Dwg. 10-B).

(B) For each opening, cut four each of T- 20 (4” panels) or T - 21 (6” panels).

Cut two each for each direction. (Dwg. 10-B).

(C) Slip 1” flanges over edges of panels, push in all the way and tek screw

to panels as required.

Made with FlippingBook - professional solution for displaying marketing and sales documents online