Section H
Heater Box Installation - Top Mounted (Floor Mount not Required)
Step 12.
Heater Box
(A) In the kit there are four each fabricated supports that need to be
welded to the heater box before it is set on top. Get the item number from the
customer drawings. Install and weld solid per Dwg. 12-A. (There are 2 left
hand and 2 right hand).
(B) In the heater box there is a section of duct that extends out of the box.
This slides in the opening left when the roof panels were installed. When
installing the heater box, place the heater box so the duct and the opening
are in line. Do not put weight of box on oven at this time (see Dwg. 12-B).
(C) When the duct and opening are in line this will give the location for four
support legs (see customer drawings for item number).
(D) To install legs, line them up under the fabricated supports that were
installed earlier. Use a level to make sure they are plumb, and then anchor
bottom with 3/8” floor anchors (not supplied) against oven wall. Install Tek
Screws all the way up the wall on legs.
(E) Apply oven cement to bottom of T-7 angle attached on four sides of
heater box as shown in Dwg. 12-E.
(F) Set the heater box down on oven and support legs. Make sure box is
flat down on roof panels so it will seal.
(G) Install all Tek Screws in the heater box angle to top of oven panels on
all four sides (see Dwg. 12-F).