Oven Assembly by RTT

Section J

Installation of Door Opening Support Channel

Step 14.

Door Opening

(A) Get item number from customer drawings for the door opening support

channel. Make sure the door opening is square.

(B) Make marks 18” back from face of channel on the end wall (see Dwg.

14-B).

(C) Place vertical channel on marks setting on floor, this channel should

extend 2” above top of oven. Install two Tek Screws in channel to hold in

place. Install 3/8” floor anchors (not supplied) in angle at bottom of channel.

Install channel on the other side of the door in the same manner.

(D) Place top channel on over top, line up with two vertical channels and

weld in place.

(E)

Install the rest of the Tek Screws.

(F) In the kit there are four short channels 17” long (see customer

drawings for item numbers). These braces weld to face channel and support

channel (see Dwg. 14-B).

(G)

Install Tek Screws as required.