Oven Assembly by RTT

Section K

Installation of Doors

Step 15.

Door

(A) When installing the doors, there should be a 1” gap at bottom and a ½”

gap at top. When the doors are installed there is a ½” gap between door and

face chann el (1” and ½” spacers are in package with latches).

(B) Lay two (2) 1” spacers on floor in front of oven and place door on

these. Put ½” spacers between door and face channel (see Dwg. 15 -B). If

the floor, doors, or openings are not perfect you can adjust by shimming

under the door on one side or the other to get the doors to line up with each

other (see Dwg. 15-B).

(C) When you have made required adjustments, weld hinges to face

channel.

Made with FlippingBook - professional solution for displaying marketing and sales documents online