Section K
Installation of Doors
Step 15.
Door
(A) When installing the doors, there should be a 1” gap at bottom and a ½”
gap at top. When the doors are installed there is a ½” gap between door and
face chann el (1” and ½” spacers are in package with latches).
(B) Lay two (2) 1” spacers on floor in front of oven and place door on
these. Put ½” spacers between door and face channel (see Dwg. 15 -B). If
the floor, doors, or openings are not perfect you can adjust by shimming
under the door on one side or the other to get the doors to line up with each
other (see Dwg. 15-B).
(C) When you have made required adjustments, weld hinges to face
channel.
Made with FlippingBook - professional solution for displaying marketing and sales documents online