Oven Assembly by RTT

Section L

Installation of Door Seals

Step 16.

Door Seals

(A) In the kit there will be Fiberglass Tad Pole Gasket, hold down strip 10

ft. long (cut as required), and fiberglass drag seal (cut as required).

(B) Dwg. 16-B shows where gasket is to be installed down both sides and

across the top.

(C)

Tek screw strip on top of gasket as shown in Dwg. 16-B.

(D) The door stop tube on the left door needs the Fiberglass Tad Pole

Gasket installed on it (see Dwg. 16-C).

Made with FlippingBook - professional solution for displaying marketing and sales documents online