WINNERS REVIEW
Education Project of the Year L-R: Donal McGloin, Tracey Brothers, Paddy Kerrin, Tracey Brothers, Malachy McLernon, Partner FPM and Martin Roberts Co Host and TV Presenter.
L-R: Claire McCollum Co Host & Broadcaster, Aidan Diamond BSG, Mark Brownlee NI Water and Angus Kerr Dept Of Infrastructure.
Infrastructure Project of the Year
WINNER: TRACEY BROTHERS ERNE CAMPUS, SOUTH WEST COLLEGE, ENNISKILLEN
This year witnessed one of the highest numbers of entries for the Transport and Utilities category. The winning project delivered with excellent collaboration between BSG, RPS and client NI Water, has been described as “a step change in the approach to building new sites”. It created a new template for wastewater treatment with reworking of an existing site to deliver innovative three-stage treatment resulting in a wetland habitat, which has already seen biodiversity and wildlife moving in. The plant will save over £440,000 in electricity charges over 25 years with the introduction of Northern Ireland’s first solar farm and battery storage at a wastewater treatment works. WINNER: BSG CIVIL ENGINEERING LTD BALLYKELLY WASTEWATER WORKS UPGRADE, BALLYKELLY
Erne Campus made history by becoming the world’s first and largest educational facility to achieve Passivhaus Premium and BREEAM outstanding accreditation. It truly put the Northern Ireland construction industry on the global map, ranking alongside the prestigious Apple 2 campus in California in terms of sustainable innovation and design. The Campus has also been awarded ‘UN High Performance Building’ status, at COP26 in Glasgow 2021, the first building in Northern Ireland to join this global network. This project sets a new standard for educational buildings across the globe in terms of renewable energy generation, energy efficiency, year-round comfort and indoor air quality. It will act as a beacon and source of inspiration for clients, building designers and contractors globally in delivering much-needed dramatic reductions in carbon emissions from the built environment.
T: +44 (0)28 6632 3471 E: mail@traceybros.com www.traceybros.com
T: +44 (0)28 7964 3610 - E: info@bsgcivilengineering.co.uk www.bsgcivilengineering.co.uk
Erne Campus, Enniskillen.
Ballykelly Wastewater Works Upgrade, Ballykelly.
www.northernbuilder.co.uk
FOLLOW US ON:
NI BUILDER | 29
Made with FlippingBook - professional solution for displaying marketing and sales documents online