Summary
Non-Waiver of Reserves (reserves must be fully funded)
Milestone Inspection – Phase 1
Milestone Inspection – Phase 2
Structural Integrity Reserve Study
Condos ≥ 3 Stories
YES (before 12/31/2024)
Only if required by Phase 1 Report
YES (by 12/31/2024)
YES (by 12/31/2024)
NO (but recommended by Seven Lakes)
Condos 1 & 2 Stories
YES (by 12/31/2024)
NO
NO
10 (2/8/2023)
Made with FlippingBook - Online Brochure Maker