SITE SELECTION AND FEASIBILITY ANALYSIS

SITE SELECTION AND FEASIBILITY ANALYSIS

SITE PHOTO I Nuuautin IR 2B

• LFN selected Nuuautin IR 2B as the preferred location for this new subdivision based on a subdivision feasibility study, as well as consistency with LFN land use plans. • The subdivision project originates from a previous community engagement and community approval in 2006. This area was known as East Fraser Subdivision (99-unit subdivision), referenced in the LFN land use plan (2016), and every CCP since starting CCP work. • Indigenous Services Canada (ISC) funded the Subdivision Feasibility Study to look at two location options for housing and the reservoir location: the Battlefield on Inkluckcheen IR 21, and a parcel on Nuuautin IR 2B. • The Stein Water System Improvement Project is based on a feasibility study conducted in 2023 that identified the key upgrade needs for the Stein Water System.

ENVIRONMENTAL ANALYSIS

• The subdivision will be located within the Ponderosa Pine very dry hot (PPxh) biogeoclimatic subzone.

• Measures will be implemented to protect the Western Rattlesnake during development, supported by a detailed Snake Mitigation Plan.

NUUAUTIN IR 2B SUBDIVISION AND STEIN WATER SYSTEM IMPROVEMENT PROJECTS WWW.APLINMARTIN.COM/LFNSUBDIVISION WWW.APLINMARTIN.COM/LFNWATERSYSTEM