STEIN WATER SYSTEM IMPROVEMENT PROJECT: UPDATE
STEIN WATER SYSTEM UPGRADES OVERVIEW I Nuuautin IR 2B
•Locations of the water system upgrades: Nuuautin IR 2, 2B, 21, and Kleetlekut IR 22.
The Stein Water System expanse is on West and East side of the Fraser River.
•Pump station upgrades will be located within Stryen 9, and Inkluckcheen 21.
• The Water System will exceed the ISC requirements for fire storage and meet the
Fire Underwriters Survey (FUS) specifications of 67 L/s for 1.5 hours for single-
family homes, and 117 L/s for 2 hours for institutional buildings (specifically at the
new Stein Valley Nlakapamux School).
•The Water System is projected to support population growth for 20 years.
•This is based on growth projections from Indigenous Services Canada’s
Indigenous Statistics and Research Unit.
NEXT STEPS •Cost Estimate
WORK COMPLETED
• Consultant Reports (ie. environmental report) •Survey Drawings •DAR Application (funding request for the design stage) •Preliminary Water System Design •Community open house to seek feedback on the preliminary design
•Contract Tender and Award •Civil Construction Drawings •Record Drawings •PAR Application (funding request for construction stage)
NUUAUTIN IR 2B SUBDIVISION AND STEIN WATER SYSTEM IMPROVEMENT PROJECTS WWW.APLINMARTIN.COM/LFNSUBDIVISION WWW.APLINMARTIN.COM/LFNWATERSYSTEM