SNOWLOADED CERTIFIED BY ADDING A FEW OPTIONS
GROUND SNOW LOAD UNHEATED (PSF)
GROUND SNOW LOAD HEATED (PSF) 2
SIDE HEIGHT (M)
BAY SIZE (M)
WIDTH (M)
SNOW CABLE 1
9 9 9 9
4
5 5 3 3 5 5 3 3 5 5 3 3
N Y N Y N Y N Y N Y N Y
17.0 23.8 27.0 35.0 10.2 17.0 17.0 27.2
25.0 35.0 40.0 50.0 15.0 25.0 25.0 40.0 10.0 15.0 20.0 25.0
4 4 4 4 4 4 4 4 4 4 4
15
10 10 10 10 12 12
20
7.0
10.32
25
15.0 17.0
12
1 Snow Cable consists of Cable Spanning Width of Frame 2 Must be Continuously Heated per ASCE 7-16 Requirements
WAYS TO INCREASE SNOW-LOAD CAPACITY • Maintain heat inside tent • Add snow cable at each arch DESIGN STANDARDS • 2018 IBC/ASCE 7-16 • Basic wind speed: 115 mph • Temporary structure • Certified fully enclosed • Eave & ridge struts required
• Limit bay sizes to 3M • Limit bay sizes to 3M & add snow cables