Anets Family Brochure

PLATINUM SERIES GAS FILTER DRAWER SYSTEMS FDAGP475D

• Platinum series gas, filter systems come with the AGP75 fryers banked together • Digital or computer controlled 4 fryer filter drawer system • 5 x 102mm deep burners per tank • 4 channel digital control is standard on all Anets Platinum fryers with melt cycle and boil out modes. Complete with backup solidstate controller which can be switched on should the digital control fail. • Easy two step filtering • 30 litre per minute filter pump for fast refill times • Self aligning filter connection for effortless hookup • Rear oil return for bottom cleaning • Filter pan is stainless with rear wheels for easy handling • Filter pan lid is self storing and out of the way • All filtration systems come standard on adjustable height castors, and with Washdown/discharge hose, Box of 50 envelope papers, Starter sample pack of filter powder, Lids, Clean out rod and brush • Cooking capacity of approximately 240kg of frozen 10mm fries / 420kg of frozen french cut fries per hour The Platinum series gas fryer are high efficiency fryers that deliver optimum performance while using minimal gas. Platinum fryers are supplied standard with Anets Platinum burner technology incorporating a highly efficient Energy Star® rated atmospheric burner reaching up to 70% thermal efficiency and lower flue temperatures. The patented burner also has a daily self-cleaning cycle, keeping burners tuned to operate in the most energy efficient manner. Product Information:

TECHNICAL DATA: Dimensions (W x D x H):

1992 x 876 x 1172

500Kg

Total Weight:

457 x 457 x 127mm (x4)

Cooking Area (W x D x H):

31-39 Litres per tank

Oil Capacity:

Natural Gas (NG) 1.7 kPa 1.0 kPa 464MJ/Hr

Universal LP Gas (ULPG)

GAS DETAILS

2.74 kPa 2.5 kPa

Minimum Supply Pressure

Operating Pressure Total Gas Supply

464MJ/Hr 3/4” BSP connection

OPTIONAL EXTRAS:

• 12 program computer control • Heat tape

240 Volt 10Amp connection required to run filter system & control board.

Legend: A

Electrical Connection

B C D

Gas Connection

Solid State Controls Digital Control Panel Basket Lifter (Optional)

E F

Computer Control Panel (Optional)

F

E

1588

876

D

NOTE: It is the responsibility of the installing gas plumber to ensure correct supply and connection sustaining appropriate pressure when all appliances are full on.

A

C

C

B

B

B

B

B

556

148

172

159

1429

Due to continuous product research and development, the information contained herein is subject to change without notice.

Revision: B - 2/8/2024 - 02

www.stoddart.com.au www.stoddart.co.nz

Made with FlippingBook - Online Brochure Maker