C+S March 2021 Vol. 7 Issue 3 (web)

CONTENTS

PAGE 12

THE COVER Underground Art Scene: Updating the Museum of Fine Arts, Houston – story on page 10 CHANNELS STRUCTURES + BUILDINGS 12 Supporting the Bottom Line: High-Performing, Engineered, EPS Geofoam as an Alternative Fill 14 Ground Improvement 17 Fermilab – Integrated Engineering Research Center 19 UMA Supports South Carolina Manufacturer's Expansion with Micropiles TRANSPORTATION + INFRASTRUCTURE 23 High-Temperature Tunnel Dampers and Switchboxes Are a Hot Combination for Riyadh Metro System 25 Invisible Enemy 27 Colesman Tunnel 29 Automation and Digitization Enabling Informed Decision Making Throughout the Tunneling Lifecycle WATER + STORMWATER 32 Land & Water Completes Sustainable Works as Part of the Thames Tideway Tunnel Project 34 Light at the End of the Tunnel: How Technical Innovation and Community Buy-in Turned a 5.6 km Microtunnelling Project into a Huge Success BUSINESS NEWS 37 5 Keys to Designing Earthquake-Resistant Buildings 38 Coming Soon: Practical BIM Implementation for Facility Management SOFTWARE + TECHNOLOGY 39 The Collaboration and Constructible Models Behind HUS Helsinki University Hospital’s Largest Project 40 Arcadis Deploys Autodesk Cloud Technology to Deliver an Infrastructure Project Bookended by Public Health Crises UNMANNED SYSTEMS 42 Taking UAV Technology Even Higher SURVEYING 43 Precise Accuracy for Underground Pipelines 45 California Company Uses New GPR Technology for Underground Utility Locating 47 Three Ways Your Surveying Practices Might Be Falling Short departments 8 Events 49 Benchmarks: How long does it take to fill an open position in the AEC industry? 50 Reader Index Columns 5 From the Publisher: Tunnel to Safety Chad Clinehens 6 Engineering Front Line: Purpose Driven Leadership and Strategy Phil Keil

PAGE 14

PAGE 40

3

march 2021

csengineermag.com

Made with FlippingBook Annual report