Casco EV Playbook 2021

Planning and Design Our deep knowledge of the many requirements and complex permitting process, coupled with our innovation design-build approach, makes Casco the EV Charging Station installa- tion industry leader. Our six-point installation process includes 1. Analyze Existing Infrastructure Location and type of station selection Available power study Parking analysis 2. ADA Accessibility Required ADA parking and path of travel Analysis of existing parking and state requirements 3. Plan for Future Growth Type of EV Charger selection analysis Fleet requirements Employee forecasting / future EV needs 4. Design, Permits and Budgeting Designed cost effective / value engineered Step by step budgeting along the way

Full set of construction drawings Permit expediting and procurement

5. Construction & Installation

Minimal interruption to site All trades contracted & supervised

6. Maintenance and Service

Maintenance of all equipment Hose replacement Manufacturer warranty work

14

Made with FlippingBook Learn more on our blog