Roller Chain General Catalog

TAPER-LOCK ® BUSHINGS Bore Size in Inches Item Code

TAPER-LOCK ® BUSHING INSTALLATION AND REMOVAL TAPER-LOCK ® Bushing Installation 1 Clean and degrease the bore and tapered surface of the bushing and the tapered bore of the pulley/hub/sprocket. 2 Insert the bushing into the pulley/hub/sprocket bore and line up the holes (Half threaded holes must line up the half straight non-threaded holes). 3 Lightly oil the locking screws and insert but do not tighten yet. 4 When using a key, it should be fitted to the shaft keyway. There should be a top clearance between the key and the keyway in the mating bushing. 5 Clean and degrease the shaft. Fit pulley/hub/sprocket onto the shaft and locate in the desired position. 6 Using a hexagon socket wrench, gradually tighten the locking screws in accordance with the required tightening torque. 7 When the drive has been operating under load for a short period, approximately 30 to 60 minutes, stop the equipment and check that the screws remain at the required tightening torque. Adjust if necessary. 8 To avoid the ingress of dirt, fill all empty holes with grease.

Bushing Number

H

1/2"

• • • • • • • S S

• • • • • • • • • S S

• • • • • • • • • • • • •

• • • • • • • • • • • • •

• • • • • • • • • • • • • • • S

• • • • • • • • • • • • • • • • • S S S

• • • • • • • • • • • • • • • • • S S S

• • • • • • • • • • • • • • • • • • • • • • • S S

I

9/16"

J K L

5/8"

• • • • • • • • • • • • • • • • • • • • • • • • • • • S S S S

11/16"

3/4"

M

13/16"

P R 1

7/8"

• • • • • • • • • • • • • • • • • • • • S S S S

• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • S S S S S S S

15/16"

• •

1"

1A 1B 1C 1D 1E 1F 1G 1H

1-1/16" 1-1/8" 1-3/16" 1-1/4" 1-5/16" 1-3/8" 1-7/16" 1-1/2" 1-9/16" 1-5/8" 1-11/16"

• • • • • • • • • • • • • • • • • • • • • • • • • • • • S S S S S S

• •

• • • • • • • • • • • • • • • • • • • • • • • • • S S S S S S S S S

• •

1I

1J 1K 1L

• • • • • •

1-3/4"

1M 1P 1R

1-13/16"

1-7/8"

TAPER-LOCK ® Bushing Removal

1-15/16"

• •

2

2"

A Remove any loading to the equipment to enable a safe removal of components. B Slacken and remove all locking screws. C Add lubricant to the previously removed screws and insert into jack-out hole/holes in the bushing. D Tighten the screws uniformly and alternately until the bushing is loose and the pulley/hub/sprocket can be moved freely on the shaft. E Remove the bushing/pulley/hub/sprocket assembly from the shaft.

2A 2B 2C 2D 2E 2F 2G 2H

2-1/16" 2-1/8" 2-3/16" 2-1/4" 2-5/16" 2-3/8" 2-7/16" 2-1/2" 2-9/16" 2-5/8" 2-11/16"

S

• •

• • • • • • • • • • • • • • • • S S S S S S

2I

2J 2K 2L

S S

2-3/4"

2M 2P 2R

2-13/16"

2-7/8"

• • • •

2-15/16"

3

3"

3B 3C 3D 3E 3F 3G 3H 3J 3K 3L 3P 3R

3-1/8" 3-3/16" 3-1/4" 3-5/16" 3-3/8" 3-7/16" 3-1/2" 3-5/8" 3-11/16"

• • • • • • • • • • • • • S S S

3-3/4" 3-7/8"

• • • •

3-15/16"

4

4"

4B 4C 4D 4F 4G 4H 4P 4R

4-1/8" 4-3/16" 4-1/4" 4-3/8" 4-7/16" 4-1/2" 4-3/4" 4-15/16"

S

• • • S S S

S

5

5"

TAPER-LOCK ® is a registered trademark of Rockwell Automation.

• Denotes stocking item

S = Shallow keyway in hub

See page 194 for Shallow keyway dimensions.

195

196

Made with FlippingBook Digital Proposal Creator