Future-oriented Solution for Manufacturing
Saving potential for new blending plants (retrofit solutions also available)
Normal cement production processes are based on producing and storing goods in the expectation of them being consumed, and in manufacturing terms, this is usually called the push principle. This principle can be an inefficient use of both resource and capital, resulting in increased stock levels and the tying up of cash. Therefore, the Schenck Process MULTICOR ® blending system facilitates the manufacturing pull principle by only producing goods when they are ordered. There is no need for the cement manufacturer to store blended products in the expectation of consumption. Thus stock levels can be reduced and cash freed to be used more efficiently elsewhere in the business.
Raw material intake & storage
3.5 m EUR
3.5 m EUR
+ +
Blending 2.4 m EUR
1.1 m EUR
+
Storage 1.0 m EUR
Not required
Schenck Process and the cement manufacturer: together we make processes work
= =
Total capital equipment cost
6.9 m EUR
4.6 m EUR
Standard plant
Schenck Process plant