GAP Trenching & Shoring E-Catalogue

8 \ Box Systems (Trenching & Shoring)

Our drag boxes provide a safe and quick means of pipe laying. Excavators are used to drag the box forward by pulling on the front strut. Pinned struts allow for easy adjustment. DRAG BOXES

Mini Drag Box

Clearance Between Struts

Max. Lateral earth Pressure

Trench Width (Internal)

Base Panel Length

Base Panel Height

Extension Panel Height

Clearance Under Strut

Thickness of panel

Max. Trench Depth

Weight of Base Panel

Weight of Extension Panel

560-3000mm 2600mm 3034mm 2005mm 1030mm 1200mm 60mm 25kN/M 2

3900mm 604kg

365kg

Maxi Drag Box

Clearance Between Struts

Max. Lateral earth Pressure

Trench Width (Internal)

Base Panel Length

Base Panel Height

Extension Panel Height

Clearance Under Strut

Thickness of panel

Max. Trench Depth

Weight of Base Panel

Weight of Extension Panel

574-3014mm 4654mm 5040mm 2000mm 1000mm 1200mm 80mm 20kN/M 2

2900mm 1076kg

650kg

5.1m Drag Box

Max. Lateral earth Pressure

Trench Width (Internal) 600 - 4100mm

Clearance Between Struts

Extension Panel Height

Clearance Under Strut at the Front

Clearance Under Strut at the Back

Max. Trench Depth

Weight of Extension Panel

Base Panel Length

Base Panel Height

Thickness of panel

Weight of Base Panel

4245mm 5100mm 2424mm 1824mm 1380mm 380mm 100mm 30kN/M 2

4200mm 1335kg

1045kg

7.1m Drag Box

Max. Lateral earth Pressure

Trench Width (Internal) 600 - 4100mm

Clearance Between Struts

Extension Panel Height

Clearance Under Strut at the Back

Max. Trench Depth

Weight of Extension Panel

Clearance Under Strut at the Front

Base Panel Length

Base Panel Height

Thickness of panel

Weight of Base Panel

6245mm 7100mm 2424mm 1824mm 1380mm 380mm 100mm 30kN/M 2

4200mm 2270kg

1800kg

Made with FlippingBook flipbook maker