ElQuator Technology for MARA

2MW POWER SYSTEM

7

8

1

2

3

6

Flow process of system operation

4

1.

Top tank water is release through the 35 degrees angle pipe down

2.

Water reach Pelton turbine

3.

Pelton spin the generator

4.

Water from Pelton turbine fall down and go through 4 sets of Pryter Impeller

5

5.

Water sucks by the water pump and

6.

Push to the top tank via the 90 degrees pipe

7.

Water reach top tank

8.

Restart process no. 1

Made with FlippingBook - professional solution for displaying marketing and sales documents online