• Completed soil samples and performed laboratory testing to determine the characteristics of the soil, for use in the design of the bridge foundations • Ongoing installation and testing of test piles at main span bridge foundations Utility Coordination • Located all ground level and above ground level utility infrastructure including wire line and pole heights • Ongoing coordination meetings with Baltimore City’s Department of Public Works and the project design team to determine and mitigate impacts to the existing 72” water line that is adjacent to the project • Ongoing coordination meetings with Baltimore Gas and Electric and the project design team to determine and mitigate impacts to the existing gas line that is adjacent to the project
Construction
Demolition of the Existing Bridge On July 7, 2025, the Design-Builder began removing the land spans and decks over the marine spans of the existing bridge. All decks over the marine and lands have been removed and the concrete is being rubblized and hauled off site. Removal of steel girders over the land spans and demolition of the piers on land is ongoing. This work is being performed under the First Amendment to the Contract, Early Work Package No. 1. Procurement of Main Span foundation piles On July 10, 2025, the Design-Builder began procurement of 96-inch diameter steel pipe piles for the Main Span foundations. This work is being performed under the First Amendment to the Contract, Early Work Package No. 2. Procurement of Material for the temporary Work Trestle On August 14, 2025, the Design-Builder began procurement of material for the temporary work trestle. This work is being performed under the First Amendment to the Contract, Early Work Package No. 3. Installation of Main Span foundation piles On October 20, 2025, the Design-Builder began mobilizing staff to begin planning for mobilizing key equipment and procurement of materials for the installation of the Main Span foundation piles. This work is being performed under the First Amendment to the Contract, Early Work Package No. 4. Installation of Temporary Work Trestle On October 20, 2025, the Design-Builder began mobilizing staff to begin planning for mobilizing key equipment and procurement of materials for the installation of the temporary work trestle. This work is being performed under the First Amendment to the Contract, Early Work Package No. 5.
6
Made with FlippingBook - professional solution for displaying marketing and sales documents online