PAPERmaking! Vol11 Nr2 2025

PAPER making!  g FROM THE PUBLISHERS OF PAPER TECHNOLOGY INTERNATIONAL ® Volume 11, Number 2, 2025  

COMPANY, SITE SUPPLIER

ORDER DESCRIPTION

SCA Östrand pulp mill Sweden

Andritz

To enhance the efficiency of the pulp mill; agreements encompass the replacement of an economiser in the recovery boiler as well as the application of the SYNERGY Services concept for pulp drying and white liquor plant operations. These upgrades will boost efficiency and availability, which will support the mill’s main goal of producing more pulp. To supply a CLT production line. The design of this CLT line is relatively straightforward but optimized for high machine utilization and production capacity. The capacity of the line is 60m 3 /shift and consists of the following machines: X-Cut 200, the new Kontizink H 1700 finger jointing machine developed specially for the US market, the Europlan 4V-S120 planer, a XE-Press (45 feet) and the Ledinek glue application system. To deliver a customized Bruks drum chipper; the equipment has been ordered for a new cutting mill and state-of-the-art stud mill being built to replace SPI’s existing sawmilling operations in Eugene, Oregon. It will efficiently handle sawmill byproducts for onward use in SPI’s biomass energy cogeneration plant and for pulp and paper customers. To deliver two forming fabric cleaners: one press felt cleaner and one press felt cleaning including moisture and permeability measuring. To modernise PM3, which will require replacement of several components as part of the rebuild, including the new MasterJet 4Tec headbox with ModuleJet dilution control, as well as the wire, press and dryer sections. To deliver one dryer fabric cleaner for PM2, 5th dryer fabric top position, with option for a second PCF Dryer Fabric cleaner in the future. To deliver training simulators; the recovery boiler and cooking simulators will support the training of operators and other operational personnel, supporting the company's long-term training ambition, and helping to ensure higher operational competence and efficiency. The Valmet Training Simulator is an exact digital copy of the mill’s processes and controls, allowing personnel to safely practice hands-on procedures and scenarios to strengthen safe behavior and prepare for troubleshooting. The high-fidelity simulators, including TrainingManager software for exercise handling and reporting, are planned to be delivered during the first quarter of 2026. Has received an order for a High-Pressure Accumulator from Sunds Fibertech, as part of a major upgrade project for their end customer in North America. Signed a framework agreement with this biotechnology company specialising in forestry and plant breeding, to develop a factory for automated and large-scale production of fast-growing and resistant forest plants. The goal is to create a cost-effective factory with a capacity of 20 million plants per year, which strengthens the bioeconomy and reduces carbon dioxide emissions.

Sierra Institute Crescent Mill

Ledinek

Northern California USA

Sierra Pacific Industries

Bruks Siwertell

Eugene Oregon

Smurfit Westrock Monterrey Mexico Smurfit Westrock Navarra, S.A. Sangüesa Spain Smurfit Westrock Parenco Renkum The Netherlands

PCF Maintenance

Voith

PCF Maintenance

Södra Cell Värö Pulp Mill Sweden

Valmet

Sunds Fibertech AB

Rinheat

SweTree Technologies Sweden

AFRY

 

Page 7 of 8

Installations

Made with FlippingBook. PDF to flipbook with ease