Cox Group Supplier Evaluation_Audit_Pack 24072025

Driver & Loader Commercial Collections: Risk Assessment Doc Ref: IM 100

No

Hazard / Risk

Control Measures

Additional control measures/Site specific

11.

Collecting Sacks and recyclables from customers premises

All staff to have manual handling training

New sack customers to be issued with customer instruction not to exceed weight (printed on sack)

Lifting carrying refuse sacks

● Before clearance commences staff to carry out a dynamic risk assessment. ● Wear company approved PPE – Gloves Hi Vis, Safety Boots as a minimum. ● Use proper lifting techniques (bend knees, keep back straight). ● Only lift sacks within your personal capabilities ● Test load before lifting. Ensure sack is balanced and manageable ● Report overweight sacks using Purgo system to service team ● Sales team to advise customer of weight restrictions and what items can be placed in the sack ● Wear appropriate gloves to protect hands. ● Handle the sack carefully, avoiding areas where sharp objects may be located. ● Inspect the sack for any visible sharp objects before lifting. ● Carry the sack from the knot ● Avoid direct contact with the waste. ● Check the integrity of the sack before lifting. ● Clean any spills immediately to prevent slips and contamination. ● Wash hands thoroughly after contact with any refuse.

Muscular skeletal Injury

Method Statement OP 200 – Sacks Wheeled Waste Containers & Bulky Items

Fatigue

Manual handling training completed for staff

Sharp Objects – causing cuts, punctures or injury to body or hands

Slips, trips and falls

Traffic movements

Sharp objects within or around sacks

Infection from exposure to hazardous waste, chemicals or vermin Leaking Waste or spillage

Handling heavy or bulky sacks that may be difficult to control

Page 9

Document Issue 01 21/08/2024 Approved by: AB

ISO 9001 / ISO 14001 / ISO 45001/PAS99: 2012

Not Controlled if printed

Made with FlippingBook Digital Publishing Software