adopted_mtp_june_9_2026 (1)

Table 8.2: Project Scoring Summary: Medium-Term Projects (cont’d)

System Efficiency Score

Safety and Vision Zero Score

Travel Choice Score

Economic Development Score

Alignment with Plans Score

Project Cost Score

Connectivity Score

Project ID #

Facility

From

To

●●●● ●●○○ ●●●● ●●○○ ●●●○ ●●○○ ●●●○ ●●○○ ●●○○

○○○○ ●●●● ○○○○ ○○○○ ●●●● ○○○○ ○○○○ ○○○○ ○○○○

●●●● ●●○○ ●●●● ●●○○ ●●●○ ●●○○ ●●●○ ●●○○ ●●○○

●●●● ●●○○ ●●○○ ●●●● ●●○○ ●●●● ●●●○ ●●○○ ●●●○

●●●○ ●●●○ ●●●○ ●●●○ ○○○○ ●●●○ ●●●○ ●●●○ ○○○○

○○○○ ○○○○ ○○○○ ○○○○ ○○○○ ○○○○ ○○○○ ○○○○ ○○○○

○○○○ ●●●● ○○○○ ○○○○ ●●●● ○○○○ ○○○○ ○○○○ ○○○○

121-1 111-1

E Altamesa

Forest Hill Dr

Anglin Dr

Chapin School Rd (RM 2871) E Altamesa Blvd E Altamesa Blvd Randol Mill Rd E Altamesa Blvd Wagley Robertson Rd E Altamesa Blvd Westshore Way (Quail Ridge Rd)

IH-20

Rolling Hills Dr

126-1 109-2 211-1 109-1 219-1 118-1 210-1

at FWWRR Everman Subdivision

Anglin Dr

Dick Price Rd Woodhaven Blvd Dick Price Rd Quicksilver Tr Forest Hill Dr

Oakland Blvd

Anglin Dr

Bonds Ranch Rd

Race St

Ramey St

E. Berry St

Green Oaks Blvd (in Arlington)

○○○○

○○○○

○○○○

●●●○

●●●○

○○○○

○○○○

213-1

John T White Rd Racquet Club Dr

●●●●

○○○○

●●●●

●●●○

○○○○

○○○○

○○○○

569-1

Walsh Ranch Minor

Minor 4 IH30 (West Fwy)

Score Symbols are defined as the following: ●●●●: High Contribution; ●●●○: Moderate Contribution; ●●○○: Low Contribution; ○○○○: No Contribution

258

Fort Worth Master Transportation Plan | Prioritized Project List & TIP

Made with FlippingBook Annual report maker