Table 8.23: Top 20 Sidewalk Priority Areas Prioritized Rank Street Name(s) Total Length (mi) methodology sheets, demand analysis layers, and planning-level cost assumptions, are included in the appendix. Total Length (ft) A ranked summary of Active Transportation projects for each mode is provided in this section. Supporting materials, including
East Lancaster Avenue / Poplar Street / East Presidio Street East Berry Street Bridgewood Drive Conner Avenue / East Rosedale Street East Lancaster Avenue / Pine Street / East Presidio Street Mansfield Highway Ellis Avenue / Mule Alley Drive Northwest 27th Street / Ellis Avenue / Rodeo Plaza / Stockyards Boulevard Northwest 25th Street / Ellis Avenue / West Exchange Avenue / Finney Avenue / North Houston Street Northwest 27th Street / Ellis Avenue / North Houston Street Mansfield Highway / Nolan Street / Shackleford Street Northeast 28th Street
4 1 2 3 5 6 7
0.17 923.49
0.08 399.62
0.01 0.02
44.34 111.37
0.05 274.07
0.07 393.17 0.06 292.71
8
0.22 1,170.76
9
0.25 1,300.66
10
0.05 246.52
11 12 13 14 15 16 17 18 19 20
0.28 1,493.08 0.13 692.37 0.07 358.93 0.27 1,449.47 0.49 2,576.10
East Berry Street Bridgewood Drive
East Lancaster Avenue West Northside Drive East Devitt Street / South Riverside Drive East Lancaster Avenue / Ludelle Street North Main Street Mansfield Highway / Wichita Street
0.03
156.67
0.16 856.79
0.19 994.10
0.03
150.27
0.30 1,609.63
Figure 8.23: Active Transportation Sidewalk Priority Areas
290
Fort Worth Master Transportation Plan | Prioritized Project List & TIP
Made with FlippingBook Annual report maker