S9074-AR-GIB-010/278
accordance with the applicable equipment specification or joint welding procedure tests. If the requirements cannot be met, the equipment shall not be used for production work until satisfactory repairs or adjustments have been made. 4.4.2 The fabricator shall devise, direct, and supervise the testing of any item of equipment (see 4.4.1) and shall bear the expense of conducting these tests. the fabricator shall notify the Government and arrange a time and place for conducting the tests so the Government inspector may be present. 4.5 NDT personnel. NDT procedures and personnel shall be qualified in accordance with MIL-STD- 271. In addition, inspectors working with S-51, S-52, and S-53 materials shall be qualified to perform the color inspection required for these materials. 4.6 Approval for fabrication and welding of titanium and titanium alloys. See 30. in appendix A.
Original 25
Made with FlippingBook - Share PDF online