TBA - NAVSEA TECHNICAL PUBLICATION

S9074-AR-GIB-010/278

5.2.3. Exceptions. Approval is required by 5.2.1 and 5.2.2 will be granted only by NAVSEA when materials related to sections 13, 14, and 15 are involved. 5.3. Material inspection. In addition to the requirement of 4.1.2. material records shall be verified to assure the conformance of the material with the applicable specifications. Verification shall be accomplished by checking mill or inspection reports against the applicable specification requirements and material marking, as applicable, against the material received. Additionally, for material supplied from a warehouse or jobber (not directly from the manufacturer), the user activity (construction) shall conduct periodic independent testing to establish reasonable confidence in the reliability of contractor test data in accordance with a written procedure. If the contractor’s quality conformance inspection records are not available, the construction activity shall establish specification conformance of the material in accordance with a written procedure. 5.3.1 Material identification. The identification of the material shall be maintained to the point of initial fabrication in accordance with a written procedure. The identification of the material shall be visually verified at the point of initial fabrication as being the same material identification or an approved alternate material identification, as required by the installation plan. 5.3.2. Filler material inspection. Inspection test reports covering tests conducted by the manufacturer shall be verified by the contractor for conformance with specification requirements. If the manufacturer’s quality conformance inspection records are not available, the construction activity shall establish specification conformance of material.

Original 48

Made with FlippingBook - Share PDF online